Wind turbine retrofit: How to reduce OEM dependency in your fleet
Most wind turbines outlive the support their manufacturer is willing or able to give. Control software stays locked, data is only partly available, and spare parts come through one channel at one price. A controller retrofit removes those limits without replacing the turbine.
Where OEM dependency comes from
For most owners and independent service providers (ISPs), dependency on the OEM sits in four places.
Controller software
The turbine runs on the OEM’s software. Parameters, service functions and fault handling are only accessible on the OEM’s terms.
Data access
Operating data is limited to what the OEM chooses to expose, which makes independent analysis and troubleshooting hard.
Spare parts
Components are bought through the OEM, even when the same part is available directly from its original manufacturer.
End of support
When an OEM discontinues a platform or leaves the market, owners can be left without updates or service.
What a controller retrofit changes
A retrofit replaces the OEM’s control software, and where needed the controller itself, with an open, independently supported solution. With an NWT retrofit, owners and operators get:
Full control
- All turbine data and parameters
- Remote monitoring and control
- Room for your own sensors
Lower costs
- Spare parts direct from the manufacturers
- Free choice of service provider
- Better service tools
More production
- Higher availability
- Power curtailment and reactive power control
- Meets current grid codes
Two routes: Software update or new controller
The right retrofit depends on the controller already in the turbine.
1-2 hours
downtime per turbine
Software update on the existing controller
Senvion MM-series turbines already use a Bachmann controller. NWT replaces the software by swapping the controller’s Compact Flash card. The turbine is back in operation within one to two hours.
EXAMPLE: SENVION MM-SERIES
2–3 hours
downtime per turbine
Replacing an obsolete controller
Some platforms run on controllers that are no longer supported. On the Gamesa G52, NWT replaces the obsolete Phoenix PLC with a Bachmann PLC.
EXAMPLE: GAMESA G52
In both cases, wiring, sensors and the turbine’s safety chain stay as they were. Pitch and converter systems keep their commissioned parameters.