Wind Turbine Retrofit Case Studies

See what OEM independence looks like in the field. These case studies show how wind turbine owners and operators used Nordic Wind Technology’s controller and converter retrofit solutions to regain full access to their turbine data, cut downtime, and improve performance without replacing the machines. Each project covers a real site, a real challenge, and measurable results across turbine platforms including Suzlon, Senvion, GE and Gamesa.

Gamesa G52 Retrofit

Nordic Wind Technology replaced EnergyPro’s obsolete Phoenix controller on its Gamesa G52 fleet in Ireland, restoring full data access, OEM independence and stronger performance.

Why retrofit instead of replace?

Retrofitting an ageing turbine with modern control technology is often more profitable than investing in a new one. By replacing obsolete controllers with a proven Bachmann-based platform, owners gain full data access and parameter control, freedom to source spare parts and choose their own service provider, higher annual energy production, and an extended operational lifetime — all while keeping the original safety systems intact.

With 550+ installed solutions and 30+ years of controller expertise, Nordic Wind Technology helps operators take back control of their fleets. That’s what “giving the power back” means.

We give the power back

30+ years of controller expertise · 550+ installed solutions