Febuary – 2024: New GE 2.5 Platform

NWT have successfully retrofitted a GE2.5 turbine with NWT controller software.
The GE2.5 turbine has been connected to the grid and is producing power.
This is a major breakthrough for NWT and for GE turbine owners!

https://nordicwindtechnology.com/wp-content/uploads/2024/02/1000004445-2.mp4