NWT passes 500 controller installations worldwide

More than 500 wind turbines around the world now run on Nordic Wind Technology controller software.

We passed the milestone with a project on 20 GE 2.5 MW turbines, where we installed NWT controller software. With those turbines running, the total went past 500 installations.

What the milestone means

Each installation is a turbine whose owner chose an OEM-independent controller: full access to their own data, the freedom to pick their service partner, and software that keeps older turbines running well for longer.

Still growing 

The number has kept rising since. Today NWT has more than 550 installed solutions on Suzlon, Senvion, GE and Gamesa turbines.

Running GE 2.5 turbines? Read about our GE 2.5 controller retrofit or see how we work OEM-independently.

Book a demo

Your request has been received! A member of the Nordic Wind Technology team will be in touch shortly.

No obligation. We’ll never pass your details on. How we handle your data